I advise endeavoring to trim the trees if at all possible, but if not Microinverters or S/E with Optimisers do the job high-quality with some overshadowing. It's going to be more details on optimiser compatibility than the rest. Have to discover what optimisers are there by now after which decide https://citypointsolar.com.au/13-2kw-solar-system-installation-perth/